Requirement
State which machinery and hazardous conditions the proposed change addresses, who defines the required safe state and who accepts the installed result. Define interfaces and responsibilities across the affected line.

Prepare an emergency-stop retrofit brief with machine and line layout, electrical drawings, task access, stopping information, interfaces and validation responsibilities.
A useful emergency-stop retrofit brief identifies the affected machinery, existing stop functions, task access and shared control interfaces. Supply the available drawings, stopping information and known modifications. Separate confirmed facts from assumptions and matters for the responsible designer to resolve before components or a final layout are selected.
Use the existing-machinery retrofit review and interface schedule. Define the design, installation, validation and return-to-use responsibilities for the complete change.
Plan emergency stop retrofits around your machine hazards, operator tasks, access, stopping behaviour and validation evidence. Discuss a site-specific safeguarding concept with Oxford Machine Guarding. A clear brief should state the operating range for hazards and foreseeable access for emergency-stop system upgrades and your requirements for risk-reduction and validation evidence.
Discuss your application

State which machinery and hazardous conditions the proposed change addresses, who defines the required safe state and who accepts the installed result. Define interfaces and responsibilities across the affected line.
Record the actual machine configurations, operating variations, task access and connected equipment covered by the assessment. Distinguish established facts, assumptions and matters needing a site survey or investigation.
Have the competent project team agree the design review, installation checks and validation plan. Retain the installed configuration, functional results, updated drawings and unresolved actions before return to use.
For emergency stop retrofits, use “shall” only for a requirement that can be demonstrated. Keep preferences, assumptions, provisional line connections and future options clearly separate.
Your final emergency stop retrofits scope must also account for space, visibility and operator ergonomics, risk-reduction and validation evidence, current regulations and the conditions at your site.